Advocate & Solicitor 

Experience

Selected cases, arbitrations and publications. For qualifications, appointments and teaching, see About Me.

Adjudication

Under the Building and

Construction Industry Security of Payment Act (SOPA).

Senior Accredited Adjudicator

Appointed by the Singapore Mediation Centre (SMC) as

adjudicator in over seventy adjudication applications

since 2009.

Review Adjudicator

Appointed by SMC as panel adjudicator in over ten review adjudications since 2013.

Counsel

Acted as counsel in adjudication applications since 2006.

Reported court cases arising out of adjudications.

2018

FT Plumbing Construction Pte Ltd

v Authentic Builder Pte Ltd 

[2018] SGCHR 03

2015

Aik Heng Contracts & Services Pte Ltd

v Deshin Engineering & Construction Pte Ltd

[2015] SGHC 293

2013

Choi Peng Kum v Tan Poh Eng Construction Pte Ltd

[2013] SGHC 272

2007

Tiong Seng Contractors Pte Ltd

v Chuan Lim Construction Pte Ltd

[2007] 4 SLR 364

Arbitration

AS ARBITRATOR

Appointed as sole arbitrator in nine arbitrations since 2010. Selected cases include.

Ard hoc

Sole arbitrator in ad hoc arbitration under the UNCITRAL Arbitration Rules 2010 arising from disputes between a foreign main contractor and its local sub-contractor in a public housing project.

SIAC

Sole arbitrator in an two SIAC arbitrations arising from disputes between a Town Council and its estate management company..

SIAC

Sole arbitrator in an SIAC arbitration arising from disputes between a UK-based company and a Singapore company over the alleged repudiation and breach of a franchise agreement.

SIAC

Sole arbitrator in an SIAC arbitration arising from disputes between the main contractor and owner of a light industrial building in relation to breaches of the main contract for the construction of the building.

SIAC

Sole arbitrator in three SIAC arbitrations between a French corporation and a Chinese company in respect of claims and counterclaims arising from the construction and management contract for a cement plant project in Indonesia. 

SIAC

Sole arbitrator in an SIAC arbitration which was a dispute between the Singapore branch of a US listed company and its distributor in the Philippines.

AS COUNSEL/ CO-COUNSEL

Selected cases include.

Ad hoc

 Arbitration between a fire protection works subcontractor and its domestic sub-contractor over works carried out at the Marina Bay Sands

SIA

Arbitration under the Singapore Institute of Architect’s arbitration rules between the main contractor and the project owner in relation to issues of delay and extension of time.

SIAC

Two SIAC arbitrations between the main contractor and its subcontractors in a soil remediation project. 

SIAC

Arbitration between a nominated electrical sub-contractor and its domestic sub-contractor over works carried out at the Resorts World Sentosa

SIAC

Arbitration between a main contractor and a developer of a luxury boutique hotel in Sentosa Island, Singapore, under the Singapore Institute of Architects’ (“SIA”) rules of arbitration. The dispute concerned wrongful termination of the main contract; defects; delays; and the main contractor’s claims for payment for work done, variations, extension of time and additional preliminaries.

SIAC

SIAC arbitration between a main contractor and its domestic sub-contractor in a housing development project in Brunei. The dispute concerned wrongful termination of the sub-contract; delays; and the sub-contractor’s claims for payment for work done, variations, extension of time and loss of profit. The quantum in dispute was estimated to be around SGD24 million. The sub-contract was governed by the FIDIC conditions.

Ad hoc

Arbitration between a Chinese temple and its main contractors relating to issues of defects, delays and variations.

SIAC

SIAC arbitration between a construction company and its sub-contractors relating to works done in an HDB upgrading project.

SIAC

Arbitration/mediation in a dispute between a construction company and the National Parks Board relating to the upgrading of the Botanic Gardens.

UNCITRAL

Arbitration under UNCITRAL rules between a local engineering company and a global MNC relating to the construction of a switchroom on an oil platform.

SIAC

Arbitration against the main contractor in disputes relating to the Changi Airport Terminal 3 Project. The dispute involved issues relating to the formation and interpretation of contractual terms; and claims for acceleration and loss and expense.

Ad hoc

Cross-border arbitration regarding defective design of elevators in a warehouse building and other ancillary claims. The case involved complex mechanical and electrical issues and required several expert witnesses.

Ad hoc

Arbitration between the main contractors and Sentosa Development Corporation in a dispute arising from the construction of the Sentosa Ferry Terminal.

Ad hoc

Malaysian arbitration regarding allegations of improper design causing collapse of open-cut slopes and other ancillary claims.

Court

Selected reported cases include.

2022

DSL Integrated Solutions Pte Ltd v

Triumph Electrical System Engineering Pte Ltd

[2022] SGHC 221

2022

Phua Kiah Mai v

The KhengChiu Tin Hou Kongand Burial Ground

[2022] SGHC 36

2018

FT Plumbing Construction Pte Ltd v

Authentic Builder Pte Ltd 

[2018] SGCHR 03

2016

MCST 3322 (The Sea View) v

Mer Vue Developments &Ors

[2016] SGHC 38

2015

Aik Heng Contracts & Services Pte Ltd v Deshin Engineering Construction Pte Ltd

[2015] SGHC 293

2013

Choi Peng Kum v Tan Poh Eng Construction Pte Ltd

[2013] SGHC 272

2010

Engineering Construction Pte Ltd 

v Sanchoon Builders Pte Ltd

[2010] SGHC 293

2009

Re Soh Seow Poh. ex parte Hong Leong Bank Bhd

[2009] SGCA 37

2007

Tiong SengContractors Pte Ltd

v Chuan Lim Construction Pte Ltd

[2007] 4 SLR 364 

2007

Spandeck Engineering (S) Pte Ltd v Defence Science & TechnoJogy Agency

[2007] SGCA 37

2006

Resource Piling Pte Ltd v Geocon Piling & Engineering Pte Ltd andAnother

[2006] SGHC 134

2005

Schindler Lifts (Singapore) Pte Ltd v Kajima Overseas Asia Pte Ltd (The OverseasAssurance Corp Ltd, Third Party)

[2008] SGDC 51

1999

Jurong Engineering Ltd v Paccan Building Technology Pte Ltd 

[1999] 3 SLR 667

1999

OCWS Logistics Pte Ltd v Soon Meng Construction Pte Ltd 

[1999] 2 SLR 376

1997

Raymond Construction Pte Ltd v Low Yang Tong

[1997] SGHC 262

Publications

2026

Co-author, “When Does Time Begin to Run”, on adjudication application timing.

[2026] SAL Prac 25

2019

Author, “What a Difference a Day Makes: When Does the Time for Lodging an Adjudication Application Start and End”,

[2019] SAL Prac 29

2018

Contributor, Chow Kok Fong, Law and Practice of Construction Contracts in Singapore, 5th Edition

Book

2006 – 2015

Joint updating editor, Atkin’s Court Forms – Singapore, LexisNexis. Wrote and contributed chapters on Mortgages Actions; Probate & Family Provision; Bankruptcy; Taxation of Bill of Costs; Electronic Filing & Service; and Adoption.

Book

CONTACT

Get in touch.

Send an enquiry